LAHomework Sign in
Glendale, CA 91205 · E Lomita Ave

700 E Lomita Ave Unit F

Built 2019 · 1,200 sq ft
SHARED CONDO LOT · APN 5675-004-036Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2019
Living area
1,200 sqft
Lot
Shared (condo complex)
Bedrooms
3
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
5675-004-036

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
Water heaterComing up
Expected 2029 to 2034From build year 2019
20262035
See 2 more systems expected later
RoofLater
Expected 2039 to 2049Original, built 2019
HVACLater
Expected 2034 to 2039Original, built 2019
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2019
    permit on filePlumbing: 1-Sewer Connection C#6048
  • 2017
    permit on fileElectrical: Installing 1 201-400 Am P Service, 1 Over 400 Amp Service, 280 Outlets, 136 Branch Circuits, 6 Distribution Panels With 30 Spaces Each, 2 Switchboards, 6 (1-5 Hp).
  • 2017
    permit on fileHeating & cooling: Installing 6 Fau Up To 100,000Btu, 24 Single Duct Vents, And 6 All Other Hoods.
  • 2017
    permit on fileWater heater: 18 Toilets, 24 Sinks, 6 Bathtubs, 6 Showers/Shower Pans, 6 Garbage Disposals, 6 Clothes Washers, 6 Dishwashers, 1 Lawn Sprinkler, 6 Water Heaters, 24 Low Pressure Gas Systems, 1 Building Sewer, And 2 Sewer Connection
  • 2017
    permit on fileElectrical: One Temporary Service
  • 2013
    permit on fileRoof: Reroof As Follows:House Only This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingles Squares (100 Sf) Being Installed: 17 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 3 New Sheathing Being Installed (Y/N): Yes High Fire Hazard Zone (Y/N): N All Tear-Offs R

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Water heater replacementExpected 2029 to 2034