LAHomework Sign in
Altadena, CA 91001 · W Calaveras St

689 W Calaveras St

Built 1949 · 1,208 sq ft
LOT 9,104 SQ FT · 1 STRUCTURE · APN 5828-012-004Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1949
Living area
1,208 sqft
Lot size
9,104 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5828-012-004

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 60 homes on W Calaveras St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedKitchen: Proposed Demo No Bearing Wall To Open Kitchen We Keep The Corner Post. Proposed Demo Closet Door And Portion Of Wall To Open Space Keep Existing Header. Remodel Kitchen.
  • 2026
    permit on file, unconfirmedHeating & cooling: Mechanical For ยท Proposed Demo No Bearing Wall To Open Kitchen We Keep The Corner Post. Proposed Demo Closet Door And Portion Of Wall To Open Space Keep Existing Header.
  • 2026
    permit on file, unconfirmedPlumbing: Plumbing For Proposed Demo No Bearing Wall To Open Kitchen We Keep The Corner Post. Proposed Demo Closet Door And Portion Of Wall To Open Space Keep Existing Header.
  • 2025
    permit on filePlumbing: Plumbing For Two Bathroom Remodels: Hallway Bathroom And Master Bathroom. No Structural Changes. 8-4-25 Picture Of Corrections Completed Vf
  • 2025
    permit on fileElectrical: Electrical For Two Bathrooms Remodel With No Structural Changes. 8-4-25 Approved Vf
  • 2025
    permit on fileBathrooms: Two Bathrooms Remodel With No Structural Changes.
  • 2025
    permit on fileHeating & cooling: Mechanical For Two Bathrooms Remodel With No Structural Changes.
  • 2023
    permit on fileRoof: House And Attached Garage 22 Sqs: Remove Existing Roof, Haul Away, Install New Ply-Wood, Install New Underlayment, Install New Composition Shingles 0890-0034 Sri 22

Manage this home to schedule a service or to update the timeline.