LAHomework Sign in
Los Angeles, CA 91306 · Quakertown Ave

6731 Quakertown Ave

Built 1953 · 1,163 sq ft
LOT 6,310 SQ FT · 2 STRUCTURES · APN 2134-013-002Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1953
Living area
1,163 sqft
Lot size
6,310 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
2134-013-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 156 homes on Quakertown Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPlumbing: Meter Gas Extension, I Need To Remove The Meter Gas In The Main House Because I Build An Addition Where The Meter Gas Is Located And I Want To Add One Meter For Adu
  • 2025
    permit on fileRoom addition: Eplanconvert Existing Detached 20' X 18' Garage To New Two Stories Irregular Shaped 25' X 23' 1/2" Adu Per Lamc 12.22 A.33(B)(1)3. Nfpa 13D Sprinklers Required
  • 2025
    permit on file, unconfirmedRoom addition: Eplan Proposed Addition And Major Remodel To (E) Sfd. Nfpa 13D Fire Sprinklers Throughout. All Work Per Engineering.
  • 2025
    permit on fileElectrical: Temporary Power Pole
  • 2025
    permit on fileElectrical: New 200-Amp Main Service

Manage this home to schedule a service or to update the timeline.