LAHomework Sign in
Los Angeles, CA 90056 · S Halm Ave

6650 S Halm Ave

Built 1965 · 2,676 sq ft
LOT 9,453 SQ FT · 1 STRUCTURE · APN 4102-008-007Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1965
Living area
2,676 sqft
Lot size
9,453 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
4102-008-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 91 homes on S Halm Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Install 2 New Tesla Energy Storage Systems
  • 2021
    permit on fileElectrical: Main Panel Upgrade To 200 Amps. Run Electrical For Ac Compressor And Air Handler. Install 100 Subpanel In Garage. For Future Ev Charger.
  • 2021
    permit on fileHeating & cooling: Change Out Hvac System
  • 2021
    permit on fileSolar: Install Roof Mounted Pv Solar At (16.575 Kw) 39 Modules, Two New Tesla Energy Storage Systems, New 200 Amp Tesla Gateway 2.0 Back Up Sub Panel, New 200 Amp Distribution Panel & 2 Inverters ***Main Panel Upgrade Permit Will Be Issued By The Sub-Contractor Doing The Work***
  • 2021
    permit on fileElectrical: 2 Tesla Powerwalls, 200A Subpanel. 225A Main Panel Upgrade By Separate Permit. Related To Unc-Solr210719002257.
  • 2021
    permit on fileElectrical: 200 A Main Panel Upgrade- 200 Sub-Panel
  • 2020
    permit on file, unconfirmedRoof: Remove The Existing Roof And Install Oc Duration Premium Coolseries Frosted Oak Owens Corning. Crrc# 0890-0005 Sri=30

Manage this home to schedule a service or to update the timeline.