LAHomework Sign in
Los Angeles, CA 91405 · Vesper Ave

6637 Vesper Ave

Built 2005 · 1,062 sq ft
LOT 13,008 SQ FT · 1 STRUCTURE · APN 2236-008-021Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
1,062 sqft
Lot size
13,008 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
2236-008-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2025 to 2035From build year 2005
20262035
HVACWorth a look now
Usually done by 2025From build year 2005
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 43 homes on Vesper Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Meters For Adu
  • 2020
    permit on fileGeneral remodel: (1 Of 2) Convert 22'10"X36'8" Garage To Living Space, Convert 19'4"X30'6" Portion Of Attached Covered Patio To Attached Garage With Laundry, Powder Room & Storage And Convert 24'9"X20'6" Portion Of Covered Patio To (N) Rec Room. All Work Per Engineer.
  • 2020
    permit on fileRoom addition: (2 Of 2) Convert (E) 40'2"X28'0" Irregular Shapeed Alq To Accessory Dwelling Unit Per Ab 494 And Sb 229. No Structural Changes Or Exterior Changes
  • 2020
    permit on fileSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2025 to 2035