LAHomework Sign in
Los Angeles, CA 90044 · W 106th St

656 W 106th St

Built 1942 · 1,448 sq ft
LOT 4,487 SQ FT · 2 STRUCTURES · APN 6061-019-001Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1942
Living area
1,448 sqft
Lot size
4,487 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
6061-019-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 159 homes on W 106th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over New Solid Sheathing _22_____Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled A
  • 2023
    permit on fileSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.
  • 2023
    permit on fileElectrical: Main Service Panel Upgrade From 100A To 200A
  • 2022
    permit on fileGeneral remodel: Enclose Patio "Comply With Department Order. Permit Will Expire 30 Days From Issuance Date"
  • 2015
    permit on file, unconfirmedRoom addition: Attached Covered Patio To Existing Single Family Dwelling (15.5' X 18. · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.