LAHomework Sign in
Glendale, CA 91206 · Atkins Dr

656 Atkins Dr

Built 1956 · 1,841 sq ft
LOT 10,135 SQ FT · 1 STRUCTURE · APN 5665-012-015Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,841 sqft
Lot size
10,135 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5665-012-015

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 28 homes on Atkins Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileHeating & cooling: (1) Up To 3H.P. A/C Change Out In Back Yard Like For Like
  • 2009
    permit on fileGeneral remodel: Legalization Of 3 Windows Along The Front Elevation Facing Street
  • 2004
    permit on fileKitchen: (E) Kitchen Cabinet Change Out Only. - (Combo Ele & Plu) -
  • 2004
    permit on fileRoof: Material: Comp Shingle Class A - No. Of Squares: 15 Sqs - Tear Off Existing (Y/N): Yes - Existing No. Of Layers: - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced S
  • 2004
    permit on fileElectrical: 15 Branch Circuits
  • 2004
    permit on fileRoof: Fire Repair Garage/Bedroom And Patio Roof/Replace (E) Trellis.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034