LAHomework Sign in
Los Angeles, CA 90056 · S Holt Ave

6510 S Holt Ave

Built 1966 · 3,780 sq ft
LOT 10,128 SQ FT · 2 STRUCTURES · APN 4102-006-047Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1966
Living area
3,780 sqft
Lot size
10,128 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
4102-006-047

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 150 homes on S Holt Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedHeating & cooling: Change Out (2) Hvac Systems
  • 2022
    permit on fileRoof: Install New Grade A Title 24 Modified Bitumen Roof Over-The-Top Of The Existing Roof. Attached Garage. 1 Story. 55 Sq. Sri= 93
  • 2022
    permit on fileSolar: Install New 7.110Kw Roof Mounted Pv Dc System (18 Modules (18) Microinverters (1) Ac Combiner (1) Enphase Battery (1) Enphase Iq Controller (1) 100 Amp Panel For Loads Upgrade Main Panel To 200 Amps
  • 2022
    permit on fileElectrical: Enphase Encharge 10T, 100A Subpanel, 225A Main Panel. Related To Unc-Solr220712003849.

Manage this home to schedule a service or to update the timeline.