LAHomework Sign in
Los Angeles, CA 90048 · W 5th St

6501 W 5th St

Built 2005 · 4,207 sq ft
LOT 5,976 SQ FT · 2 STRUCTURES · APN 5510-008-012Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
4,207 sqft
Lot size
5,976 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
5510-008-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2025 to 2035From build year 2005
20262035
HVACWorth a look now
Usually done by 2025From build year 2005
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 136 homes on W 5th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedKitchen: Replace Drywall/Plaster (Patch And Paint). Non-Structural Repair Only. Interior Kitchen Remodel/Repair (No Changes In Walls Or Openings). 1 Bathroom(S).Bathroom Remodel For Residential Buildings (No Structural Changes)..
  • 2022
    permit on fileSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2025 to 2035