LAHomework Sign in
Temple City, CA 91780 · Oak Ave

6448 Oak Ave

Built 1938 · 2,076 sq ft
LOT 18,501 SQ FT · 3 STRUCTURES · APN 5382-014-029Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1938
Living area
2,076 sqft
Lot size
18,501 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5382-014-029

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2009
Expected 2024 to 2029From the 2009 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 164 homes on Oak Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: Add 100 Amp Sub-Panel
  • 2025
    permit on fileElectrical: *Install1 X 20 Kwh Battery. Connect To 200A Main Panel + Backup Panel With Ac Disconnect. *Mount On Roof Iron Ridge Racking.
  • 2025
    permit on fileSolar: Solar Pv + Battery - Install (25) X 410W Pv Modules = 10.25 Kw Dc) * Install 35 Optimizers * Install 1 X 10 Kw Hybrid Inverter. *Install1 X 20 Kwh Battery. Connect To 200A Main Panel + Backup Panel With Ac Disconnect. *Mount On Roof Iron Ridge Racking.
  • 2025
    permit on file, unconfirmedPlumbing: Showers, Hose Bibb, Lavatories, Water Closets For The Detached Accessory Dwelling Unit
  • 2025
    permit on file, unconfirmedHeating & cooling: Install (2) Mini Split Systems (2) Ventilation Fans For The Detached Accessory Dwelling Unit
  • 2025
    permit on file, unconfirmedElectrical: (8) Outlets, (8) Light Fixtures, (2) Exhaust Fans, (2) Ac Units And Upgrade Service Panel To 200 Amp For The Detached Accessory Dwelling Unit
  • 2011
    permit on fileSolar: Electrical For 5Kw Solar System
  • 2011
    permit on fileRoom addition: (N) Detached Patio Cover With 5Kw (30 Panel) Solar Array
  • 2009
    permit on filePlumbing: Plumbing For 2Nd: Unit
  • 2009
    permit on fileHeating & cooling: 2 Window A/C For 2Nd: Unit
  • 2009
    permit on fileElectrical: Electrical For 2Nd: Unit
  • 2009
    permit on fileElectrical: Upgrade Service Panel To 200 Amp, 10 Outlets And 3 Lightfixtures

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementExpected 2024 to 2029