LAHomework Sign in
Los Angeles, CA 91307 · Valley Circle Ter

6411 Valley Circle Ter

Built 1968 · 2,775 sq ft
LOT 13,206 SQ FT · 1 STRUCTURE · APN 2032-025-020Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1968
Living area
2,775 sqft
Lot size
13,206 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2032-025-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on Valley Circle Ter →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: (Eplan) Pv1 Pc For Installation Of Roof Mounted Solar Panels. Pv System Includes 31 Modules With 31 Optimizers And 1 Central Inverter System Connected To Main Service Panel. System Size Is 12.4Kw Dc/10Kw Ac.
  • 2023
    permit on file, unconfirmedHeating & cooling: Replacement Of Gas To Heat Pump. Relocation From Garage To The Attic
  • 2022
    permit on fileKitchen: Interior Structural Remodel: Remodel Kitchen; Remodel Bathroom On The First Floor; Remove And Replace Existing Drywall; Remove Two Non-Bearing Walls On The 1St Floor; Remove 6' Portion Of 1St Floor Shear Wall And Install 8' Shear Wall At The Same Line.

Manage this home to schedule a service or to update the timeline.