LAHomework Sign in
Beverly Hills, CA 90210

640 Williams Ln

Built 2015 · 12,361 sq ft
LOT 25,135 SQ FT · APN 4391-038-009Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2015
Living area
12,361 sqft
Lot size
25,135 sqft
Bedrooms
4
Bathrooms
7
Home type
Single-family
Parcel (APN)
4391-038-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACComing up
Expected 2030 to 2035From build year 2015
20262035
Water heaterWorth a look now
Expected 2025 to 2030From build year 2015
20262035
See 1 more system expected later
RoofLater
Expected 2035 to 2045Original, built 2015
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedGeneral remodel: Fire Pit, Deck And Planter
  • 2026
    permit on file, unconfirmedPlumbing: Fire Pit, Deck And Planter
  • 2026
    permit on file, unconfirmedGeneral remodel: Sump Pit, Pump And Drainage Piping
  • 2026
    permit on file, unconfirmedElectrical: Sump Pit, Pump And Drainage Piping
  • 2026
    permit on file, unconfirmedPlumbing: Sump Pit, Pump And Drainage Piping
  • 2026
    permit on file, unconfirmedElectrical: (N) Concrete Pad W/Prefab Above-Ground Spa
  • 2026
    permit on file, unconfirmedPlumbing: (N) Concrete Pad W/Prefab Above-Ground Spa
  • 2026
    permit on file, unconfirmedPool: (N) Concrete Pad W/Prefab Above-Ground Spa
  • 2025
    permit on file, unconfirmedHeating & cooling: (Eplan) Remodel (E) Basement. No Added Square Footage No Change In Footprint.
  • 2025
    permit on file, unconfirmedRoom addition: 285 Sq. Ft. Addition To Basement (E-Plan Under Bs2400501)
  • 2025
    permit on file, unconfirmedElectrical: 285 Sq. Ft. Addition To Basement
  • 2025
    permit on file, unconfirmedHeating & cooling: 285 Sq. Ft. Addition To Basement
  • 2025
    permit on file, unconfirmedPlumbing: 285 Sq. Ft. Addition To Basement
  • 2025
    permit on file, unconfirmedRoof: Main House Re-Roof With Pvc
  • 2025
    permit on file, unconfirmedElectrical: (E-Plan) Install Energy Storage System, Tesla Powerwall 3 (34.5Kw, 40.5Kwh), Energy System Disconnect Tesla Gateway 3, Non-Fused Ac Disconnect Tesla Remote Meter Span.Io Subpanels
  • 2024
    permit on file, unconfirmedGeneral remodel: Interior Remodel No Structural Work No Layout Change No Exterior Work
  • 2024
    permit on file, unconfirmedElectrical: Interior Remodel No Structural Work No Layout Change No Exterior Work
  • 2024
    permit on file, unconfirmedHeating & cooling: Interior Remodel No Structural Work No Layout Change No Exterior Work
  • 2024
    permit on file, unconfirmedPlumbing: Interior Remodel No Structural Work No Layout Change No Exterior Work
  • 2024
    permit on file, unconfirmedGeneral remodel: (Eplan) Remodel (E) Basement. No Added Square Footage No Change In Footprint.
  • 2024
    permit on file, unconfirmedElectrical: Remodel (E) Basement. No Added Square Footage No Change In Footprint.
  • 2024
    permit on file, unconfirmedPlumbing: Remodel (E) Basement. No Added Square Footage No Change In Footprint.
  • 2022
    permit on file, unconfirmedGeneral remodel: Exploratory Demo For Existing Structure Framing Verification

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2025 to 2030
  • 2030
    HVAC replacementExpected 2030 to 2035