LAHomework Sign in
Pasadena, CA 91106 · S Hill Ave

640 S Hill Ave

Built 1920 · 3,559 sq ft
LOT 35,417 SQ FT · 6 STRUCTURES · APN 5327-010-021Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1920
Living area
3,559 sqft
Lot size
35,417 sqft
Structures on lot
6 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
5327-010-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2018
Expected 2033 to 2038From the 2018 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 35 homes on S Hill Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Ele Permit For: New Construction Of Adu At 1112 Sq/Ft With Attached 3- Car Garage At 744 Sq/Ft - Assigned 644 S Hill Ave
  • 2026
    permit on file, unconfirmedPlumbing: Plm Permit For: New Construction Of Adu At 1112 Sq/Ft With Attached 3- Car Garage At 744 Sq/Ft - Assigned 644 S Hill Ave
  • 2026
    permit on file, unconfirmedHeating & cooling: Mec Permit For: (Including Fire Damper) New Construction Of Adu At 1112 Sq/Ft With Attached 3- Car Garage At 744 Sq/Ft - Assigned 644 S Hill Ave
  • 2026
    permit on file, unconfirmedRoom addition: Online: New Construction Of Adu At 1112 Sq/Ft With Attached 3- Car Garage At 744 Sq/Ft - Assigned 644 S Hill Ave
  • 2023
    permit on fileElectrical: Installation Of Electric Vehicle Charger (Level 2) & Addition Of Circuit (50 Amp)
  • 2018
    permit on fileHeating & cooling: Replace Exist Furnace, Coil, & A/C To Exist Ductwork.
  • 2016
    permit on fileElectrical: Replace Electrical For Pool Pump And Branch Circuit Breaker
  • 2011
    permit on fileElectrical: Replacement Of Existing Light Fixture With Two Recessed Lights.
  • 2011
    permit on filePlumbing: Plumbing For Non Structural Bath Remodel
  • 2010
    permit on fileRoof: Tear Off Flat Roof And Hot Mop New Built Up (No Change In Height Or Pitch Of Roof)
  • 2009
    permit on fileGeneral remodel: Retro-Fit Earthquake Chimney 22 Ft Long With Stucco Finish - Per La City Standard Plans
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2008
    permit on fileRoof: Remove All Existing Layer Covering, New Roof Sheating, New Composition Shingles Class "A" Adjustment To Include Lower Portion Of Roof (10) Additional Squares
  • 2008
    permit on fileRoof: New Roof @ Portion Of Existing Roof/Tear Off (E) Roof And Re-Roof Of Composition Shingles Class "A"
  • 1997
    permit on filePlumbing: Relocate Existng Shower Stall (W/I Exist. S/F) (No Structural Work)
  • 1991
    permit on filePlumbing: Pl - Kitchen Alteration - Interior Only + Plumbing
  • 1991
    permit on fileElectrical: El - Kitchen Alteration - Interior Only + Plumbing
  • 1990
    permit on fileKitchen: Bu - Kitchen Alteration - Interior Only + Plumbing

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Roof replacementExpected 2030 to 2040