LAHomework Sign in
Pasadena, CA 91101 · N Madison Ave

635 N Madison Ave

Built 1923 · 2,942 sq ft
LOT 11,354 SQ FT · 5 STRUCTURES · APN 5731-005-048Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
2,942 sqft
Lot size
11,354 sqft
Structures on lot
5 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
5731-005-048

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 117 homes on N Madison Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Install Subpanel (60 Amp) From Main Panel Located At 641 W Madison Ave, Connect All Circuits Back To New Subpanel
  • 2025
    permit on fileElectrical: Install 60Amp Subpanel From Main Panel Located At 647 N Madison Ave And Connect All Old Circuits Back To New Subpanel
  • 2025
    permit on fileElectrical: Install Subpanel Subpanel 60Amp Run From Main Panel Located At 641 N Madison Ave. One 40Amp Subpnael For House And Connect All Old Circuits Back To New Subpanel
  • 2025
    permit on fileElectrical: Install 5 Gang Meter Socket 200Amp Main Panel. Install 60Amp Subpanel. Connect All Old Circuits Back To New Sub Panel
  • 2025
    permit on filePlumbing: Replace Main Water Service Line From The Meter To Each Unit
  • 2023
    permit on fileRoof: Go Over Existing Roof. Reroof Composition Roof. Cool Roof. Class "A". 9 Squares.
  • 2023
    permit on fileRoof: Go Over Existing Roof. Reroof Composition Roof. Cool Roof. Class "A". 11 Squares.
  • 2023
    permit on fileRoof: Go Over Existing Roof. Reroof Composition Roof. Cool Roof. Class "A". 11 Squares.
  • 2023
    permit on fileRoof: Go Over Existing Roof. Reroof Composition Roof. Cool Roof. Class "A". 11 Squares.
  • 2022
    permit on fileHeating & cooling: Mechanical For Interior Remodel
  • 2022
    permit on filePlumbing: Plumbing For Interior Remodel
  • 2022
    permit on fileElectrical: Electrical For Interior Remodel
  • 2022
    permit on fileKitchen: Interior Remodel At 243 Sq Ft - Relocate Kitchen To Dining Room; Remodel Bathroom
  • 1992
    permit on fileRoof: Rf - Re Roof Residence W/Gaf Fiberglass Shingle Ul Class A
  • 1992
    permit on fileRoof: Rf - Re Roof Residence W/Class A Fiberglass Shingl Ulr21 Gaf
  • 1992
    permit on fileRoof: Rf - Re Roof Residence W/Gaf Fiberglass Shingle Ul Gaf
  • 1992
    permit on fileRoof: Rf - Re Roof Residence W/Class A Fiberglass Shingl Ulr21 Gaf

Manage this home to schedule a service or to update the timeline.