LAHomework Sign in
Los Angeles, CA 90293 · Esplanade

6337 Esplanade

Built 1967 · 2,364 sq ft
LOT 2,345 SQ FT · 1 STRUCTURE · APN 4116-005-046Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1967
Living area
2,364 sqft
Lot size
2,345 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
4116-005-046

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 32 homes on Esplanade →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2024
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 10 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2024
    permit on fileHeating & cooling: Disconnect And Move 2 Condensers From Roof For Roofers To Perform Roof Work. Reinstall Units When Roof-Work Is Complete.

Manage this home to schedule a service or to update the timeline.