LAHomework Sign in
Playa Vista, CA 90094 · S Para Way

6335 S Para Way

Built 2011 · 3,585 sq ft
SHARED CONDO LOT · APN 4211-026-174Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2011
Living area
3,585 sqft
Lot
Shared (condo complex)
Bedrooms
3
Bathrooms
5
Home type
Single-family
Parcel (APN)
4211-026-174

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2031 to 2041From build year 2011
20262035
HVACWorth a look now
Expected 2026 to 2031From build year 2011
20262035
Water heaterWorth a look now
Expected 2021 to 2026From build year 2011
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 5 homes on S Para Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on filePool: (N) Built-In Spa. Per Engineering Design.
  • 2022
    permit on file, unconfirmedBathrooms: Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2021
    permit on fileKitchen: Remodel (E) Kitchen & Master Bathroom, Replace Windows In Dining Room With Doors And Add A Juliette Balcony. Replace (E) Windows In Master Bathroom, Install New Wrought Iron Planter.
  • 2021
    permit on fileKitchen: Widen (E) Sliding Patio Door In The Game Room On The 1St Floor And Replace (E) Bifold Balcony Door With Sliding Glass Door, Same Size Same Location In The Kitchen On The 2Nd Floor.
  • 2021
    permit on fileElectrical: Upgrading Main Panel For Larger Capacity

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2021 to 2026
  • Now
    HVAC replacementExpected 2026 to 2031
  • 2031
    Roof replacementExpected 2031 to 2041