LAHomework Sign in
Los Angeles, CA 90036 · S Sycamore Ave

629 S Sycamore Ave

Built 1923 · 1,368 sq ft
LOT 6,475 SQ FT · 2 STRUCTURES · APN 5507-023-006Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
1,368 sqft
Lot size
6,475 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
5507-023-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 127 homes on S Sycamore Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Install An Ev For Car Charging.
  • 2025
    permit on fileSolar: (Eplan) Pv1 Installation Of Roof Mounted Solar Panels And Installation Of Energy Storage System. Pv System Includes 12 Modules With 4 Rsds, 1 Tesla Powerwall, 1 Expansion, And 2 Panels Connected To Existing Main Service Panel. System Size Is 4.92Kw Dc/11.50Kw Ac.
  • 2024
    permit on fileElectrical: 200Amp Temporary Power Pole
  • 2024
    permit on fileElectrical: Upgrade An Electrical Service
  • 2024
    permit on fileElectrical: 50 Amp Circuit
  • 2024
    permit on fileHeating & cooling: Install 5 Tons Gas Electric Package Unit
  • 2023
    permit on fileRoom addition: Addition To And Remodel Of An (E) Sfd. Relocate Kitchen And Laundry Area. Create New Bedroom And Expand Master Bedroom. 2 New Bathrooms.

Manage this home to schedule a service or to update the timeline.