LAHomework Sign in
Temple City, CA 91780 · Sultana Ave

6265 Sultana Ave

Built 1925 · 2,112 sq ft
LOT 10,874 SQ FT · 3 STRUCTURES · APN 5384-005-018Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
2,112 sqft
Lot size
10,874 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
5384-005-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2014
Expected 2034 to 2044From the 2014 permit
20262035
HVACOn record 2014
Expected 2029 to 2034From the 2014 permit
20262035
Water heaterOn record 2014
Expected 2024 to 2029From the 2014 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 231 homes on Sultana Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2016
    permit on fileSolar: Pv Solar Roof Install 2.65 Kw, 10 Panel And 1 Inverter
  • 2014
    permit on fileElectrical: 3 Outlets, 1 Switch And 1 Light Fixture
  • 2014
    permit on fileElectrical: 12 Outlets And 4 Light Fixtures
  • 2014
    permit on fileRoof: Tear Off Reroof 30 Yr Composition Shingles
  • 2014
    permit on fileHeating & cooling: Install Air Conditioning And Furnace System And 10 Airinlets
  • 2014
    permit on fileWater heater: Plumbing For Remodeling 2 Bathrooms, Repiping, Water Heater And Gas Line
  • 2014
    permit on fileHeating & cooling: 2 Ventilation Fans
  • 2014
    permit on fileElectrical: 6 Outlets And 2 Light Fixtures For Detached Garage
  • 2014
    permit on fileElectrical: (1) Upgrade Service Panel 200 Amp (2) 34 Outlets And 16 Light Fixtures
  • 2013
    permit on fileRoom addition: Add 2 Bedrooms And Remodel Existing 2 Bathrooms
  • 2009
    permit on fileElectrical: Elec Riser Increase
  • 2009
    permit on fileRoof: Raise Roof Pitch @ (E) Residence With Gable Roof

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2024 to 2029
  • 2029
    HVAC replacementExpected 2029 to 2034