LAHomework Sign in
Temple City, CA 91780 · Ivar Ave

6263 Ivar Ave

Built 1940 · 1,552 sq ft
LOT 5,124 SQ FT · 1 STRUCTURE · APN 5386-010-029Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1940
Living area
1,552 sqft
Lot size
5,124 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5386-010-029

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACOn record 2013
Expected 2028 to 2033From the 2013 permit
20262035
Water heaterOn record 2003
Usually done by 2018From the 2003 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 94 homes on Ivar Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: 1) 1707000-Xx-Y (11.5Kw) Ess.
  • 2026
    permit on file, unconfirmedSolar: Rooftop Mounted Solar Energy System: (10) Rec460Aa Pure Solar Modules. (1) 1707000-Xx-Y (240V, 11.5Kw) Inverter. (1) 1707000-Xx-Y (11.5Kw) Ess. Existing System: Yes. System Size: 4.6 Kw Dc (11.51 Kw Ac)
  • 2025
    permit on fileElectrical: Hardwire Installation Of Level 2 Ev Charger At Driveway
  • 2022
    permit on fileRoof: 21 Sq.Ft. Composition Shingle Roof Overlay. Owens Corning Tru Def Cool Roof Plus Color To Be Determined Synthetic Underlayment 1 Sq.Ft. Btu Torch Cliffside Grey(0890-0036).
  • 2022
    permit on fileSolar: Installation Of Roof Mounted Pv 4.8Kw (12) Modules
  • 2021
    permit on fileGeneral remodel: "In Accordance With Ladbs Standard Plan #1": Earthquake Hazard Reduction In Existing Wood Frame Residential Building With Weak Cripple Walls And Unbolted Still Plates
  • 2013
    permit on filePlumbing: (1) Tub, (1) Water Closet, (1) Lavatorie And Gas Line
  • 2013
    permit on fileHeating & cooling: Install A 4 Ton A/C Heating Unit And Vents
  • 2013
    permit on fileBathrooms: Bathroom Remodel, (1) Ext Door And (3) Int Doors
  • 2007
    permit on fileGeneral remodel: Replace 7 Windows New Windows To Be Vinyl, Dual Glazed Low E
  • 2007
    permit on fileRoof: Roof Repair Front Side Reroof Back Side Over Lay (New Extention) Composition Shingles
  • 2003
    permit on fileWater heater: C/O Water Heater
  • 2000
    permit on filePlumbing: Plumbing For Addition And Remodeling
  • 2000
    permit on fileElectrical: Electrical For Addition And Remodeling
  • 2000
    permit on fileRoom addition: Addition Of Family Room And Full Bathroom

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2018
  • 2028
    HVAC replacementExpected 2028 to 2033