LAHomework Sign in
Los Angeles, CA 90022 · Gloucester St

6175 Gloucester St

Built 1948 · 1,212 sq ft
LOT 5,413 SQ FT · 2 STRUCTURES · APN 6338-009-017Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
1,212 sqft
Lot size
5,413 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6338-009-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 58 homes on Gloucester St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Installing On Sfd 6175 Gloucester St, (2) 200 Amp Services, With Separate Risers 18” Apart. Service For 6175 Includes Distribution Breakers For Existing Circuit Wiring Only. Other 200Amp Services For Detached Adu 6173 Gloucester St. New Underground Feeder To Adu’S 100 Subpanel Is Existing.
  • 2023
    permit on fileRoom addition: Conversion Of 360 Sf Detached Garage To Accessory Dwelling Unit (Adu) Studio With 1-Bath And Kitchen
  • 2023
    permit on fileElectrical: Electrical For A Conversion Of 360 Sf Detached Garage To Accessory Dwelling Unit (Adu) Studio With 1-Bath And Kitchen
  • 2023
    permit on fileHeating & cooling: Mechanical For A Conversion Of 360 Sf Detached Garage To Accessory Dwelling Unit (Adu) Studio With 1-Bath And Kitchen
  • 2023
    permit on filePlumbing: Plumbing For A Conversion Of 360 Sf Detached Garage To Accessory Dwelling Unit (Adu) Studio With 1-Bath And Kitchen
  • 2023
    permit on filePlumbing: Sewer For A Conversion Of 360 Sf Detached Garage To Accessory Dwelling Unit (Adu) Studio With 1-Bath And Kitchen

Manage this home to schedule a service or to update the timeline.