LAHomework Sign in
Temple City, CA 91780 · Golden West Ave

6059 Golden West Ave

Built 1934 · 2,390 sq ft
LOT 9,940 SQ FT · 1 STRUCTURE · APN 5385-019-001Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1934
Living area
2,390 sqft
Lot size
9,940 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5385-019-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2014
Expected 2034 to 2044From the 2014 permit
20262035
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 264 homes on Golden West Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: (2) Tesla Batteries
  • 2025
    permit on fileSolar: 9.36 Kwdc Roof Mounted Pv System (24) Solar Panels With (2) Tesla Batteries
  • 2025
    permit on file, unconfirmedPlumbing: Plumbing For A New Single Family Dwelling And Connect To Public Sewer
  • 2025
    permit on file, unconfirmedHeating & cooling: Install Hvac System For A New Single Family Dwelling
  • 2025
    permit on file, unconfirmedElectrical: Electrical For A New Single Family Dwelling With A 200 Amp Service Panel
  • 2025
    permit on fileElectrical: 200A Mpu
  • 2024
    permit on fileElectrical: Install Tesla Ev Charger And Add (2) Sub-Panel 100 Amp Each
  • 2024
    permit on filePlumbing: Bathtubs/Showers, Hose Bibbs, Lavatories And Water Closets For The Bathrooms
  • 2024
    permit on fileHeating & cooling: Installation Of (3) Ventilation Fans For The Bathrooms
  • 2024
    permit on fileElectrical: 27 Outlets, 4 Light Fixtures And Exhaust Fans For The Interior Remodel
  • 2024
    permit on fileBathrooms: Interior Remodel Convert Existing Powder Room Into Bathroom #3. Portion Of Existing Family Room Into Bedroom #2 And Convert Existing Bathroom Into (2) Bathrooms
  • 2022
    permit on fileGeneral remodel: Remove 6 Sq.Ft. Tile, Install New Underlayment. Install New Composition Shingle, Reinstall Tile
  • 2022
    permit on fileSolar: Residential Roof Mount Pv System 6.270 Kw, 19 Modules
  • 2015
    permit on fileElectrical: 40 Outlets And 15 Light Fixtures
  • 2015
    permit on fileRoom addition: (1) Add New Cover Patio On 1St. Floor 220 Sf. (2) Ex 2 Wood Deck On 2Nd: Floor To Be Repaired
  • 2014
    permit on fileRoof: Tear Off 20 S.F. Install Momerlite Saxony - No Plywoodreplacement
  • 2014
    permit on fileElectrical: 4 Outlets And 21 Recess Lights
  • 2014
    permit on fileGeneral remodel: Replace 19 Windows, 4 Sliding Patio Doors, Closet Cabinet And Entry Door
  • 2014
    permit on fileGeneral remodel: Lift Existing 2 Pieces Mission Tile Remove Underlayment.Install 2 Layers Of 40 Lb Base Sheet And Re-Set Tile
  • 2014
    permit on fileElectrical: 20 Outlets, 26 Light Fixtures, Garbage Disposal, Dishwasher,Washing Machine And Exhaust Fan
  • 2014
    permit on fileRoom addition: To Finalized Expired Permit For 2-Story Addition Dated7-27-81
  • 2014
    permit on fileKitchen: Bathroom, Kitchen To Be Remodeled And Existing Closet To Be Converted Into A Laundry Room

Manage this home to schedule a service or to update the timeline.