LAHomework Sign in
Temple City, CA 91780 · Loma Ave

6042 Loma Ave

Built 1938 · 2,209 sq ft
LOT 14,668 SQ FT · 4 STRUCTURES · APN 5384-013-011Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1938
Living area
2,209 sqft
Lot size
14,668 sqft
Structures on lot
4 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
5384-013-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 179 homes on Loma Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: 1.84 Kw Grid Tied Solar Photovoltaic System With (4) Modules. New 125A Pv Load Center
  • 2026
    permit on fileElectrical: Ess. New 60A Ac Disconnect
  • 2026
    permit on fileSolar: 9.20 Kw Grid Tied Solar Photovoltaic System With (27) Kwh Ess. New 60A Ac Disconnect
  • 2025
    permit on fileElectrical: Electrical For A New Detached Accessory Dwelling With 400 Amp Main Panel And (1) Sub-Panel 200 Amp
  • 2025
    permit on fileElectrical: Electrical For A New Single Family Dwelling With (3) Sub-Panel 200 Amp Each
  • 2025
    permit on fileHeating & cooling: Installation Of One - 2 Ton Central Heating & Cooling Split System, Air Inlets And Exhaust Vents For A New Detached Accessory Dwelling Unit
  • 2025
    permit on fileHeating & cooling: Installation Of Two - 5 Ton Central Heating & Cooling Split Systems, Air Inlets And Exhaust Vents For A New Single Family Dwelling
  • 2024
    permit on filePlumbing: Plumbing For A New Detached Accessory Dwelling Unit And Connect To Public Sewer
  • 2024
    permit on filePlumbing: Plumbing For A New Single Family Dwelling And Connect To Public Sewer
  • 2024
    permit on fileElectrical: 100 Amp Temporary Power Pole
  • 2014
    permit on file, unconfirmedPlumbing: Gas Line For Fau Unit
  • 2014
    permit on filePlumbing: Install 2 Hose Bibbs And Gas Line For Fau Unit
  • 2014
    permit on file, unconfirmedHeating & cooling: Install A/C + Heating System And 5 Air Inlets
  • 2014
    permit on fileHeating & cooling: Install A/C + Heating System And 8 Air Inlets
  • 2014
    permit on file, unconfirmedElectrical: Electrical For A/C + Fau Unit
  • 2014
    permit on fileElectrical: Electrical For A/C + Fau Unit And Upgrade Service Panel To200 Amp
  • 2002
    permit on fileElectrical: Upgrade To 100Amp Panel

Manage this home to schedule a service or to update the timeline.