LAHomework Sign in
Glendale, CA 91201 · Hazel St

604 Hazel St

Built 1927 · 1,200 sq ft
LOT 6,900 SQ FT · 3 STRUCTURES · APN 5627-014-014Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1927
Living area
1,200 sqft
Lot size
6,900 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
5627-014-014

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2005
Expected 2025 to 2035From the 2005 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 20 homes on Hazel St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Electrical Service Upgrade For 400 Amp
  • 2024
    permit on fileSolar: Installation Of An Ess System 38.4Kwh Or Less And/Or Flush Roof Mounted Photovoltaic System On A Residential Single-Family Dwelling, Including Adus, 38Kw Or Less. This Installation Shall Comply With The Electrical, Fire And Building Provisions Of The Most Recent Applicable Code Cycle.
  • 2023
    permit on fileRoom addition: New Adu 1000 Q At Rear Part Of The Property
  • 2020
    permit on fileGeneral remodel: Replace Main House Front Door , Replace All New Stucco.
  • 2020
    permit on fileGeneral remodel: Rear Yard Patio 196 Sf
  • 2017
    permit on fileElectrical: 1 200 Amp Service
  • 2017
    permit on fileKitchen: Kitchen Remodel, 2 Bathroom Remodel, No Movement Of Walls. No Exterior Changes. Fixture Same Location. No Structural Changes. Remove Plaster And Replace With Drywall And Insulation In Living, Kitchen And 2 Beds And 2 Baths. This Permit Includes Electrical, Plumbing And Mechaincal Within Scope Of Wor
  • 2005
    permit on fileRoof: Residential Reroof As Follows:- - Garage - This Is A Change Of Roofing Material (Y/N): N - Proposed Roofing Material: Comp Shingle - Squares (100 Sf) Being Installed: 5 - Tear Off Existing (Y/N): Y - Existing Layers Of Roofing: 3 - New Sheathing Being Installed (Y/N): N - High Fire Hazard Zone (Y/N)
  • 2005
    permit on fileRoof: Residential Reroof As Follows:- House - This Is A Change Of Roofing Material (Y/N): N - Proposed Roofing Material: Comp Shingle - Squares (100 Sf) Being Installed: 15 - Tear Off Existing (Y/N): Y - Existing Layers Of Roofing: 3 - New Sheathing Being Installed (Y/N): N - High Fire Hazard Zone (Y/N):

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2025 to 2035