LAHomework Sign in
Glendale, CA 91206 · Canyon Dr

600 Canyon Dr

Built 1925 · 2,168 sq ft
LOT 6,886 SQ FT · 2 STRUCTURES · APN 5661-006-017Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
2,168 sqft
Lot size
6,886 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5661-006-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2004
Usually done by 2024From the 2004 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 43 homes on Canyon Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2004
    permit on fileHeating & cooling: No Installation Of Rooftop Mechanical Equipment Shall Be Allowed In Single Family Residential Zones - - 1 Heating, 1 A/C, 1 Appliance Vent, 1 Connection Of Equipment To A Gas System.
  • 2004
    permit on fileGeneral remodel: Replace 3 Doors Same Openings, Remove And Fill 1 Window, Replace Stucco On Upper Unit (602). Work To Be Done On 600 And 602 Canyon
  • 2004
    permit on fileElectrical: 1 200 Service, 2 Distribution Panel 24 Space

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2024