LAHomework Sign in
Los Angeles, CA 91367 · Rod Ave

5977 Rod Ave

Built 1966 · 2,622 sq ft
LOT 13,332 SQ FT · 1 STRUCTURE · APN 2032-021-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1966
Living area
2,622 sqft
Lot size
13,332 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
2032-021-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 48 homes on Rod Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileKitchen: Kitchen Remodel For Residential Buildings (No Structural Changes).Window (4 ) And Door (3) Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildi
  • 2021
    permit on fileSolar: [E-Plan] $0 Fee Due Per Assembly Bill 1414. Pv1 Pc For Installation Of Roof Mounted Solar Panels And Installation Of Energy Storage System. Pv System Includes 48 Panels, 2 Central Inverter System, 2 Energy Storage System, 1 Distribution Panel, And 1 Tesla Backup Gateway Connected To Existing Main Se
  • 2017
    permit on file, unconfirmedPlumbing: Plumbing Permit · GOLDEN BEST PLUMBING INC

Manage this home to schedule a service or to update the timeline.