LAHomework Sign in
Los Angeles, CA 90034 · Guthrie Ave

5972 Guthrie Ave

Built 1946 · 2,702 sq ft
LOT 6,221 SQ FT · 2 STRUCTURES · APN 5066-003-011Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1946
Living area
2,702 sqft
Lot size
6,221 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
3
Home type
Triplex (3 units)
Parcel (APN)
5066-003-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 46 homes on Guthrie Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedSolar: [Eplan] Change To An Approved Set By Updating The Plan With New Design And New Inverter To Se5000 With #10 Awg Feedersadded (3) Three Bollards Infront Of The Inverter And Ac Disconnect With 2Ft. Apart As Per Ahjrequirements.New System Size Is 5.135 Kw Dc (5.0 Kw Ac).
  • 2023
    permit on fileSolar: Eplan: Plan Check For A Pv2 Installation Of A 3.55 Kw Dc/ 3.8Kw Ac System With 9 Modules/ Optimizers, 1 Inverter, And (1) New Load Center Interconnecting Through The Service Panel.Main Panel Upgrade To A 400A 3 Meter-Pak Panel On Separate Permit.
  • 2023
    permit on fileSolar: [Eplan][Pv1]Installation Of A 3.56Kwdc/3.8Kwac Pv System With 9 Modules, 1 Inverter And A 125A Sub Panel. Main Panel Upgrade To A 400A 3 Meter-Pak Panel On Seperate Permit
  • 2023
    permit on fileElectrical: Change Address From 5972 1/2 Guthrie Ave And Change Work Description To: Main Panel Upgrade To A 300A 3 Meter-Pak Service To Serve 5972, 5972 1/2 And 5974 Guthrie Ave
  • 2023
    permit on fileSolar: [Eplan] Installation Of A 5.135 Dc Kw System With 13 Modules, 1 Inverter And 2 125A Sub Panels. 1 New Solaredge 10Kw Battery And New Solaredge Back Up Interface.Main Panel Upgrade To A 400A 3 Meter-Pak Panel On Seperate Permit.
  • 2022
    permit on fileElectrical: Main Panel Upgrade To A 400A Service.

Manage this home to schedule a service or to update the timeline.