LAHomework Sign in
Temple City, CA 91780 · Reno Ave

5941 Reno Ave

Built 1926 · 1,448 sq ft
LOT 8,484 SQ FT · 2 STRUCTURES · APN 5384-018-045Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
1,448 sqft
Lot size
8,484 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5384-018-045

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 92 homes on Reno Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2014
    permit on fileElectrical: Re-Wire 22 Outlets
  • 2014
    permit on fileGeneral remodel: Remove Plaster, Rewire, Insolate, Re-Drywall On Living Room And Bedroom #1
  • 2013
    permit on fileElectrical: 16 Outlets And 5 Light Fixtures
  • 2013
    permit on fileElectrical: Electrical Panel Upgrade/Changeout From 100 Amp To 200 Amp
  • 2013
    permit on filePlumbing: Bathtub/Shower, Hose Bibb, Lavatorie And Water Closet
  • 2013
    permit on fileElectrical: 8 Outlets, 5 Light Fixtures And Electric Heater
  • 2013
    permit on fileRoom addition: Master Bathroom Addition/Remodel Remove Interior Wall & Ceiling Plaster In Bedrooms #2 & 3 Then Insulate And Drywall
  • 2011
    permit on filePlumbing: Plumbing For Remodel Existing Bathroom
  • 2011
    permit on fileElectrical: Electrical For Remodel Existing Bathroom And Bedroom
  • 2011
    permit on fileBathrooms: Remodel Existing Bathroom And Bedroom
  • 2011
    permit on fileRoof: Tear Off Existing Roofing Material As Is. Install #30 Feltand Gaf/Elk 30 Yr Composition Shingles
  • 2011
    permit on fileElectrical: Electrical For Remodel Kitchen & Service
  • 2011
    permit on fileKitchen: Remodel Kitchen & Service

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Roof replacementExpected 2031 to 2041