LAHomework Sign in
Los Angeles, CA 91367 · County Oak Rd

5928 County Oak Rd

Built 1992 · 4,598 sq ft
LOT 11,020 SQ FT · 1 STRUCTURE · APN 2032-027-068Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1992
Living area
4,598 sqft
Lot size
11,020 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2032-027-068

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2022From build year 1992
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 48 homes on County Oak Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedElectrical: Replace (E) 200A Main Servicepanel With A (N) 225A Ratedmain Panel With 200A Factoryinstalled Main Ocpd
  • 2023
    permit on fileSolar: [E-Plan] Installation Of Battery Backup System To Existing Pv. Scope Includes 5 Tesla 13.5Kwh Powerwall 2 Batteries, 1 Tesla Backup Gateway 2, 2 X 200A Subpanels And 1 X 400A Subpanel
  • 2023
    permit on file, unconfirmedElectrical: [Eplan] Plan Chekc Only For Delta "2" Changes To An Approved Set Of Plans, The Chnage Is Swapping Out The Model Type Of The Msp Of The Mpu To Reflect The On Field Model.
  • 2022
    permit on fileElectrical: Upgrading Existing Main Service Panel To New 200A.
  • 2021
    permit on fileSolar: Zero Dollar Fees Due To Ab1414. [Eplan] Pv1 Roof Mount 25.160Kw Consisting Of 68 Modules And 68 Microinverters Connected To A New 200A Msp.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2022