LAHomework Sign in
Los Angeles, CA 90038 · Virginia Ave

5814 Virginia Ave

Built 1917 · 2,263 sq ft
LOT 7,463 SQ FT · 2 STRUCTURES · APN 5534-017-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1917
Living area
2,263 sqft
Lot size
7,463 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
5
Home type
Fourplex (4 units)
Parcel (APN)
5534-017-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 16 homes on Virginia Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: E-Plan. New 43 Units Apartment Building. New 1000 Amperes 120/208V, 3 Phase Service. New Distribution Board, New Panels, Power And Lighting.
  • 2026
    permit on file, unconfirmedElectrical: (Eplan) Revisions To Permit 23041-10000-74787. Delta E2 And E3.Previous Storage Rooms 133 And 134 Converted Into Unit 105, Previous Unit 105 Renamed 106Previous Unit 106 Renamed 107, Previous Unit 107 Renamed 108, Previous Unit 108 Renamed 109.Changed Kitchen Appliances. Changed Aic Equipment Requir
  • 2026
    permit on file, unconfirmedPlumbing: Cap Sewer Line
  • 2026
    permit on file, unconfirmedPlumbing: Install New Plumbing System Including Potable Water, Waste/Vent, Rainwater And Duplex Sump Pump Systems. 3-Inch Equivalent Domestic Water Meter With Rp Backflow Preventer.
  • 2022
    permit on fileElectrical: Electrical Permit For Installation Of 2 Electrical Receptacles.
  • 2022
    permit on fileWater heater: Inspection Of (1) Existing Water Heater
  • 2022
    permit on fileWater heater: Inspection Of (1) Existing Water Heater

Manage this home to schedule a service or to update the timeline.