LAHomework Sign in
Los Angeles, CA 90272 · Via De La Paz

581 Via De La Paz

Built 2008 · 5,201 sq ft
LOT 6,570 SQ FT · 1 STRUCTURE · APN 4412-017-018Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2008
Living area
5,201 sqft
Lot size
6,570 sqft
Structures on lot
1
Bedrooms
7
Bathrooms
6
Home type
Single-family
Parcel (APN)
4412-017-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2028 to 2038From build year 2008
20262035
HVACWorth a look now
Expected 2023 to 2028From build year 2008
20262035
Water heaterWorth a look now
Usually done by 2023From build year 2008

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 156 homes on Via De La Paz →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: 200Amp Temporary Power Pole
  • 2024
    permit on fileBathrooms: 3 Bathroom(S).Bathroom Remodel For Residential Buildings (No Structural Changes)..
  • 2021
    permit on fileElectrical: Relocate Recepticals For Kitchen Remodel
  • 2021
    permit on filePlumbing: Rework Plumbing In Existing Locations For Kitchen Remodel
  • 2019
    permit on fileSolar: (Eplan) Install New 5.2 Kw Ac Rooftop Solar System On (E) Sfd, (1) · SOLARCITY CORPORATION
  • 2019
    permit on file, unconfirmedElectrical: $0.00 Fee Due To Ab1414 [Eplan] Changes To Approved Set To Relocate E · TESLA ENERGY OPERATIONS INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2023
  • Now
    HVAC replacementExpected 2023 to 2028
  • 2028
    Roof replacementExpected 2028 to 2038