LAHomework Sign in
Glendale, CA 91214 · Northwoods Ln

58 Northwoods Ln

Built 1979 · 1,856 sq ft
SHARED CONDO LOT · APN 5610-009-099Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1979
Living area
1,856 sqft
Lot
Shared (condo complex)
Bedrooms
3
Bathrooms
2
Home type
Condo / townhome
Parcel (APN)
5610-009-099

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2021
Expected 2041 to 2051From the 2021 permit
HVACOn record 2019
Expected 2034 to 2039From the 2019 permit
20262035
Water heaterOn record 2019
Expected 2029 to 2034From the 2019 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 58 homes on Northwoods Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileElectrical: Installing A (N) E/V Charger In Garage. 2 Branch Circuits.
  • 2021
    permit on filePlumbing: Installing 4 Fixtures.
  • 2021
    permit on filePlumbing: Installing 3 Fixtures.
  • 2021
    permit on fileRoof: Remove Existing Fire Damaged Wall And Framing At Garage And Replace With New Matching Wall Framing. Remove 697 Sq Ft Of Existing Damaged Roof Framing At Garage And Replace With New Matching Framing. Remove Al Fire Damaged Interior And Exterior Finishes And Replace With New Matching Finishes .No Fire
  • 2021
    permit on fileRoof: Remove Existing Fire Damaged Wall And Framing At Garage And Replace With New Matching Wall Framing. Remove 698 Sq Ft Of Existing Damaged Roof Framing At Garage And Replace With New Matching Framing. Remve Al Fire Damaged Interior And Exterior Finishes And Replace With New Matching Finishes.No Fire D
  • 2019
    permit on fileWater heater: Type Of Item : Water Heater Gas/Tankless Water Heater : Gas Water Heater Size : 60 Number Of Dishwashers : 0 Number Of Water Heaters : 1
  • 2019
    permit on fileHeating & cooling: Number Of Fau Up To 100,000 Btu (*) : 1 Up To And Including 3 Hp Compressors, Condensers : 1
  • 2018
    permit on filePool: Fire Damage Repairs, Replace Damaged Pool Equipment. (Locate At The Pool Shed For 1-58 Condo Building).
  • 2018
    permit on filePool: (Common Area 1-58 Northwoods Ln). Structural Repairs To Pool Shed That Had Some Fire Damage. Repairs Are Intended To Restore Pool Shed To Pre-Damage State.
  • 2015
    permit on fileWater heater: 1 Water Heater.
  • 2015
    permit on fileHeating & cooling: Change Out Package Unit One Fau Up To 100,000 Btu And One Up To 3 Hp A/C
  • 2015
    permit on fileHeating & cooling: 1 Fau Up To 100,000 Btu
  • 2014
    permit on fileSolar: Flat Roof (Y/N): Nobattery Back-Up (Y/N): Roof Mounted (Y/N): No Photovoltaic (Y/N): Yes Number Of Arrays:1 Number Of Branch Circuits: Size Of Water Storage Tank: Amp Service:200 Hp Transformer (Hp = Kw & Kva): Kw (Kilowatt): 12.00 12/9/2014 Change Of Contractor From Green Power Systems To Current E
  • 2014
    permit on fileKitchen: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. Kitchen Remodel Only. No Change Interior Wall, No Change Exterior
  • 2013
    permit on fileGeneral remodel: Replace Patio Sliding Door.
  • 2013
    permit on fileGeneral remodel: Replace The 8 Window From Bronze Alum Sliders To Bronze Alum Sliders/Same Size.
  • 2013
    permit on fileGeneral remodel: Replacement Windows 9 Total
  • 2011
    permit on fileHeating & cooling: 1-Fau & 1-Compressor (Unit#5)
  • 2009
    permit on fileWater heater: 1-Water Heater
  • 2006
    permit on fileHeating & cooling: 1 Prefab Fireplace.
  • 2005
    permit on fileWater heater: 1 Water Heater
  • 2004
    permit on fileRoof: Material:Bur - No. Of Squares:3 - Tear Off Existing (Y/N):Y - Existing No. Of Layers:Flat - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -
  • 2004
    permit on fileRoof: Material:Bur - No. Of Squares:3 - Tear Off Existing (Y/N):Y - Existing No. Of Layers:Flat - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -
  • 2004
    permit on fileRoof: Material: Built Up Roof Class A - No. Of Squares: 9 Sqs. - Tear Off Existing (Y/N): Yes - Existing No. Of Layers: Two Layers - New Sheathing (Y/N): Yes - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Exis
  • 2003
    permit on fileRoof: Material:Class A - No. Of Squares:6 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:1 - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -
  • 2002
    permit on fileRoof: Material: Built-Up Roof Class A - No. Of Squares: 10 Sqs. - Tear Of Existing (Y/N): Yes - Existing No. Of Layers: One - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spa
  • 2001
    permit on fileRoof: Material: Install New U.S. Intec Gbsp-4 App Torch Applied Modified Bitumen Membrane Roof Application Class A (Bldg. B) - No. Of Squares: 6 - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Water heater replacementExpected 2029 to 2034