LAHomework Sign in
South Gate, CA 90280 · Mckinley Ave

5741 Mckinley Ave

Built 1942 · 1,903 sq ft
LOT 6,471 SQ FT · 2 STRUCTURES · APN 6243-018-023Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1942
Living area
1,903 sqft
Lot size
6,471 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
6243-018-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 111 homes on Mckinley Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Electrical Service Upgrade Part Of 2-Gang Panel
  • 2023
    permit on fileSolar: Sfres Newphotovoltaic System Installation (15 Modules - 299 Sqft. -6Kw) Panel Upgrade - 200 Amp (Requires Southern California Edison Meter Spot Approval)
  • 2014
    permit on fileGeneral remodel: Replacement Of Six (6) Windows
  • 2013
    permit on fileGeneral remodel: New Pre Sale #13-6870 Scheduled For Monday 04/15/13 - Inspection Is Between 9-1 Pm... Garages Must Be Open For Inspection, Dogs Must Be Tied Call Inspector Between 8-9 Am For A Morning Inspection Confirmation At (323)563-9549, Please Be Aware That, Although The Inspection Is Exterior Only, If The In
  • 2013
    permit on fileElectrical: Ps#13-6870 Remove Non Permitted Carport Remove Non Permitted Enclosed Patio Cover Attached Ti Rear If Dwg (North) 10 Window Replacements Back Door Light Rquired Cleanout At East Side Of Dwg Water Heater Repl
  • 2011
    permit on filePlumbing: Gas Re Pipe

Manage this home to schedule a service or to update the timeline.