LAHomework Sign in
South Gate, CA 90280 · Taft Ave

5721 Taft Ave

Built 1942 · 878 sq ft
LOT 6,968 SQ FT · 2 STRUCTURES · APN 6243-020-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1942
Living area
878 sqft
Lot size
6,968 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6243-020-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 15 homes on Taft Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedGeneral remodel: Inspection Only For New Presale With Ps# 24-10086 Inspection Date: Monday, 03/04/2024. Inspection Hours Are Between 9-5 Pm - Call Inspector Between 8-9 Am For A Morning Or Afternoon Confirmation At (323)563-9549, Dogs Must Be Tied Please Be Aware That, Although The Inspection Is Exterior Only, If Th
  • 2024
    permit on file, unconfirmedElectrical: Correct Violations At Dwg Per Ps# 24-10086 -Relocated Laundry From Garage To Interior Of Dwelling To -Relocated/Replaced Water Heater -Gas Piping Line At Water Heater Altered -Front And Rear Yard Sprinkler Systems -Installed (Replaced) Water Service From Water Meter To Front Of Dwelling -Kitchen Upg
  • 2011
    permit on file, unconfirmedGeneral remodel: New Pre Sale #11-6047-- Scheduled For Monday 04/04/2011- 9-1
  • 2011
    permit on fileGeneral remodel: 10 Window Replacements - Must Meet Emergency Exiting, See Handout. Less Than 18" From Floor Or Doors Must Be Tempered Glass, Smoke Detectors Are Required In Each Bedroom And Hallways Adjacent To Bedrooms Recycle Required-Submit Wrrp Form And Receipts Before Calling For Final. Carbon Monoxide Detecto

Manage this home to schedule a service or to update the timeline.