LAHomework Sign in
Los Angeles, CA 91356 · Geyser Ave

5716 Geyser Ave

Built 1950 · 1,903 sq ft
LOT 6,464 SQ FT · 1 STRUCTURE · APN 2156-023-003Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
1,903 sqft
Lot size
6,464 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
2156-023-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 45 homes on Geyser Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileElectrical: Install 100 A Service For Adu (New)
  • 2023
    permit on fileHeating & cooling: New Mini Split
  • 2022
    permit on fileKitchen: Eplan 1.Convert Existing Bedroom & Office Into New 443 Sq.Ft 1 Bedroom A.D.U.Per State Law And Gcs 65852.2(E)(1)(A) .2.Rebuild Steps In A.D.U.3.Remodel Kitchen In Main House.4.Remove Load Bearing Walls & Open Floor Plan In Main House.
  • 2022
    permit on fileBathrooms: Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2022
    permit on filePlumbing: Inspection Of (1) Existing Sgsov For Home Sale
  • 2020
    permit on fileWater heater: Remove And Replace Gas Water Heater
  • 2019
    permit on file, unconfirmedRoof: Reroof With 27 Sqrs Comp Shingle Roofing. Existing Solid Sheathing. Re · SAMSON ROOFING AND CONSTRUCTION CORP
  • 2017
    permit on file, unconfirmedHeating & cooling: Hvac Permit · TASSIO TEMPERATURE CONTROL INC
  • 2014
    permit on filePlumbing: Plumbing Permit · ARNDT & TRAINA INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035