LAHomework Sign in
Los Angeles, CA 90272 · Mount Holyoke Ave

569 Mount Holyoke Ave

Built 2012 · 4,026 sq ft
LOT 7,156 SQ FT · 1 STRUCTURE · APN 4412-016-020Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2012
Living area
4,026 sqft
Lot size
7,156 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
5
Home type
Single-family
Parcel (APN)
4412-016-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACComing up
Expected 2027 to 2032From build year 2012
20262035
Water heaterWorth a look now
Expected 2022 to 2027From build year 2012
20262035
See 1 more system expected later
RoofLater
Expected 2032 to 2042Original, built 2012
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 58 homes on Mount Holyoke Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels And Installation Of Energy Storage System. Pv System Includes 19 Modules, 1 Powerwall3 Hybrid, 1 Tesla Gateway, Subpanel Connected To Existing 400A Main Service Panel. System Size Is 7.79Kw Dc/11.5Kw Ac
  • 2025
    permit on fileElectrical: 100Amp Temporary Power Pole
  • 2021
    permit on fileElectrical: Exterior Dedicated Electrical Line 240 V

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2022 to 2027
  • 2027
    HVAC replacementExpected 2027 to 2032