LAHomework Sign in
Temple City, CA 91780 · Heleo Ave

5639 Heleo Ave

Built 1960 · 1,627 sq ft
LOT 6,473 SQ FT · 1 STRUCTURE · APN 8588-003-035Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1960
Living area
1,627 sqft
Lot size
6,473 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
8588-003-035

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterOn record 2024
Expected 2034 to 2039From the 2024 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 61 homes on Heleo Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePlumbing: Main Water Line Replacement
  • 2024
    permit on fileWater heater: Gas Line And Water Heater
  • 2024
    permit on filePlumbing: Shower, Clothes Washer, Lavatory, Sink, Water Closet, Water Main And Connect Detached Studio To Public Sewer
  • 2024
    permit on fileHeating & cooling: Install (1) Mini Split System, Appliance Vent And Ventilation Fan For A Detached Studio Accessory Dwelling Unit
  • 2024
    permit on fileElectrical: 5 Branch Circuits, 12 Outlets, 5 Light Fixtures, Garbage Disposal, Range Hood, Washing Machine, Exhaust Fan, Electrical Water Heater With 100 Amp Sub-Panel For Detached Studio Accessory Dwelling Unit
  • 2023
    permit on fileElectrical: Upgrade To 200 Amp Service Panel
  • 2023
    permit on fileRoof: Tear Off Main House & Attached Garage, Plywood Replacement And Roofing With Shingles
  • 2016
    permit on fileElectrical: (E) Panel Relocated 100 Amp
  • 2016
    permit on fileHeating & cooling: Installaing 5 Ton Air Conditioning & Heating System
  • 2015
    permit on filePlumbing: Plumbing Work
  • 2015
    permit on fileElectrical: Electrical Work
  • 2015
    permit on fileRoom addition: Existing Detached Storage Extension
  • 2015
    permit on fileKitchen: Demolish 1 Bedroom & Fireplace, Add 2 Bedrms, 1.75 Bathrm Remodel (E) Bathrm, Move Some Walls, Doors, Replace 5 Windows. Relocate Kitchen And Front Porch 24 Sf.

Manage this home to schedule a service or to update the timeline.