LAHomework Sign in
Pasadena, CA 91103 · Pepper St

560 Pepper St

Built 1924 · 720 sq ft
LOT 5,472 SQ FT · 3 STRUCTURES · APN 5727-007-006Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
720 sqft
Lot size
5,472 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5727-007-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2016
Expected 2036 to 2046From the 2016 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 58 homes on Pepper St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedRoom addition: Online Adu: Converting Existing Detached Garage At 176 Sq/Ft With Addition At 110 Sq/Ft To New Adu; Total Adu At 286 Sq/Ft
  • 2024
    permit on filePlumbing: Plumbing Permit For Online Adu: Converting Existing Detached Garage At 176 Sq/Ft With Addition At 110 Sq/Ft To New Adu; Total Adu At 286 Sq/Ft
  • 2024
    permit on fileElectrical: Electrical Permit For Online Adu: Converting Existing Detached Garage At 176 Sq/Ft With Addition At 110 Sq/Ft To New Adu; Total Adu At 286 Sq/Ft
  • 2024
    permit on file, unconfirmedHeating & cooling: Mecahnical Permit For Online Adu: Converting Existing Detached Garage At 176 Sq/Ft With Addition At 110 Sq/Ft To New Adu; Total Adu At 286 Sq/Ft
  • 2024
    permit on fileHeating & cooling: Install (N) Ducted Mini-Split Heat Pump System & (N) Flexible Airducts
  • 2023
    permit on fileElectrical: Main Panel Upgrade To 200 Amps
  • 2016
    permit on fileRoof: Legalize (11) Windows With New Dual Glaze Low E Windows, Same Size And Meet Egress For Bedrooms
  • 2016
    permit on fileGeneral remodel: Interior Work Only, Remove Interior Perimeter Drywall//Plaster. Insulate & Re-Drywall Walls & Ceiling R-30 & R-13 Walls.
  • 2016
    permit on fileElectrical: House Rewire, Smoke Alarm, New Cir
  • 2016
    permit on filePlumbing: Install New Plumbing Fixtures For A Remodel
  • 2016
    permit on fileKitchen: Interior Remodel Of Existing Kitchen & (1) Bathroom (No Additional Sq. Ft.)
  • 2016
    permit on fileElectrical: Install New Electrical Fixtures For A Remodel
  • 2016
    permit on fileHeating & cooling: Install New Mechanical Fixtures For A Remodel
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram

Manage this home to schedule a service or to update the timeline.