LAHomework Sign in
Temple City, CA 91780 · Pal Mal Ave

5560 Pal Mal Ave

Built 1946 · 2,471 sq ft
LOT 14,416 SQ FT · 1 STRUCTURE · APN 8586-010-017Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1946
Living area
2,471 sqft
Lot size
14,416 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
8586-010-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2010
Expected 2025 to 2030From the 2010 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 81 homes on Pal Mal Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileGeneral remodel: Voluntary Seismic Retrofit Per Ladbs Standard Plan Detail #7
  • 2021
    permit on fileElectrical: Derate Existing 200A Main Breaker To New 175A Main Breaker
  • 2021
    permit on fileSolar: Roof Mounted Photovoltaic Solar System 11.900 Kw (Dc) / 9.860 Kw (Ac) 34 Solar Modules, 34 Microinverters.
  • 2010
    permit on fileRoof: Tear Off Re-Roof 30 Yr Composition Shingle Icc Est 1475 To Match New Addition
  • 2010
    permit on fileHeating & cooling: Alteration Of Exist Duct System, 1 Air Inlet And 1 Ventilation Fan
  • 2010
    permit on fileElectrical: Electrical For New Addition
  • 2010
    permit on fileBathrooms: Add Master Bedroom, Bathroom, W.I.C., 795 S.F. Extended Family Room, Bedroom 418 S.F. And Patio 220 S.F.
  • 2003
    permit on fileElectrical: Upgrade Electrical Panel To 200Amps
  • 2001
    permit on fileBathrooms: Change Window In Bathroom
  • 2001
    permit on fileElectrical: Electrical For Bathroom Remodel

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementExpected 2025 to 2030
  • 2030
    Roof replacementExpected 2030 to 2040