LAHomework Sign in
Los Angeles, CA 91411 · Halbrent Ave

5463 Halbrent Ave

Built 1952 · 2,104 sq ft
LOT 6,731 SQ FT · 1 STRUCTURE · APN 2250-008-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
2,104 sqft
Lot size
6,731 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
2250-008-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 80 homes on Halbrent Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedWater heater: Replace Water Heater
  • 2022
    permit on file, unconfirmedRoof: Reroof With 28 Sqrs Comp Shingle Roofing Over New Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2022
    permit on file, unconfirmedGeneral remodel: Replace Existing Siding With New Stucco For Single Family Dwellings And Duplex Only. (2) Window And (2) Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All
  • 2022
    permit on fileElectrical: Main Electrical Panel Upgrade To 200 Amp On Same Location
  • 2022
    permit on fileSolar: [Eplan][Pv1]Installtion Of A New 9Kwac Pv System With 27 Modules With Integrated Microinverters. Main Breaker Derated To 175A.
  • 2022
    permit on fileHeating & cooling: Change Out

Manage this home to schedule a service or to update the timeline.