LAHomework Sign in
Calabasas, CA 91302 · Collingwood Cir

5425 Collingwood Cir

Built 1994 · 7,239 sq ft
LOT 25,092 SQ FT · 1 STRUCTURE · APN 2049-038-048Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1994
Living area
7,239 sqft
Lot size
25,092 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
7
Home type
Single-family
Parcel (APN)
2049-038-048

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2024From build year 1994
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 33 homes on Collingwood Cir →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPlumbing: Replacing All Water Piping In The House With Pex Pipes
  • 2020
    permit on fileElectrical: Install 80 Amp Car Charger 208 Volt
  • 2020
    permit on fileHeating & cooling: Replace Three (3) Furnaces& Coils- 1-Attic, 1-Garage, 1-Upstairs Hallway (Like For Like) Replace Three (3) Condensers-All In Side Yard (Like For Like)
  • 2020
    permit on file, unconfirmedWater heater: Replace Water Heater - Located In Garage (Like For Like)

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2024