LAHomework Sign in
Glendale, CA 91206 · N Howard St

542 N Howard St

Built 1924 · 2,314 sq ft
LOT 7,858 SQ FT · 2 STRUCTURES · APN 5643-010-001Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
2,314 sqft
Lot size
7,858 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5643-010-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 146 homes on N Howard St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoof: Lift Up And Reinstall (E) Clay Roof Tile. Install New Underlayment. 600 Square Feet
  • 2019
    permit on fileGeneral remodel: Framing & Stucco & Wall Repair At Corner Of Garage Due To Car Damage. 10/22/2020 Changed From Contractor To Owner/Builder
  • 2011
    permit on fileRoof: Reroof As Follows: This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Class A, Built Up Squares (100 Sf) Being Installed: 6Sqs Tear Off Existing (Y/N):Yes Existing Layers Of Roofing: New Sheathing Being Installed (Y/N): No High Fire Hazard Zone (Y/N): No All Tear-Offs Require
  • 2011
    permit on fileRoof: Reroof As Follows: This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Class A, Built Up Squares (100 Sf) Being Installed: 6 Sqs Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: New Sheathing Being Installed (Y/N): No High Fire Hazard Zone (Y/N): All Tear-Offs Require S
  • 2005
    permit on fileElectrical: 1-200 Amp Service And 1-Sub Panel 6 Spaces.

Manage this home to schedule a service or to update the timeline.