LAHomework Sign in
Los Angeles, CA 91316 · Oak Park Ave

5359 Oak Park Ave

Built 2008 · 7,500 sq ft
LOT 17,169 SQ FT · 1 STRUCTURE · APN 2258-029-005Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2008
Living area
7,500 sqft
Lot size
17,169 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
7
Home type
Single-family
Parcel (APN)
2258-029-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2028 to 2038From build year 2008
20262035
HVACWorth a look now
Expected 2023 to 2028From build year 2008
20262035
Water heaterWorth a look now
Usually done by 2023From build year 2008

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 30 homes on Oak Park Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileRoom addition: Interior Alteration To Create An Irregular, 11' X 22' (182 Sf), Study On The Second Floor From The (E) Raised Ceiling Entryway. See Comments.
  • 2021
    permit on fileKitchen: Kitchen/Bathroom (6 ) Remodel For Residential Buildings (No Structural Changes).
  • 2021
    permit on fileBathrooms: Re-Stucco For Residential Buildings.Bathroom (1 ) Remodel For Residential Buildings (No Structural Changes).
  • 2021
    permit on fileGeneral remodel: Replace Drywall (No New Walls Added) For Single Family Dwellings And Duplexes Only.
  • 2021
    permit on fileElectrical: Electrical For Tv Room For Existing Sfd

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2023
  • Now
    HVAC replacementExpected 2023 to 2028
  • 2028
    Roof replacementExpected 2028 to 2038