LAHomework Sign in
Temple City, CA 91780 · Arden Dr

5318 Arden Dr

Built 2009 · 2,093 sq ft
LOT 18,560 SQ FT · 2 STRUCTURES · APN 8585-020-004Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2009
Living area
2,093 sqft
Lot size
18,560 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
8585-020-004

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2029 to 2039From build year 2009
20262035
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterWorth a look now
Usually done by 2024From build year 2009

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 96 homes on Arden Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileHeating & cooling: Install (5) New Mini Split Systems For Detached Accessory Dwelling Unit
  • 2025
    permit on fileElectrical: 225/220A Panel Upgrade With 200A Main Breaker + 200A Sub-Panel
  • 2025
    permit on fileElectrical: (1) Tesla Powerwall & Sub-Panel
  • 2025
    permit on fileSolar: System Size 10270W Dc 23000W Ac- Modules (26) Longi Green Energy Technology Co Ltd: Lr5-54Habb-395M - Inverters: (1) Tesla Powerwall 3 1707000-Xx-Y (1) Tesla Powerwall 3 1707000-Xx-Y Racking: Ultra Rail, Attachment Detail , Umbrella Foot To Framing, Snr-Dc-00339* Energy Storage System (2) Tesla: Pow
  • 2024
    permit on fileElectrical: (1) Ess Battery
  • 2024
    permit on fileSolar: Pv Solar, 5.135Kw (13) Modules (1) Inverter (1) Ess Battery
  • 2024
    permit on filePlumbing: Shower, Clothes Washer, Lavatorie, Sink, Water Closet, Gas Outlets And Water Main For Detached Accessory Dwelling Unit
  • 2024
    permit on fileHeating & cooling: Ventilation Fan For A Detached Accessory Dwelling Unit
  • 2024
    permit on fileElectrical: 20 Outlets, 10 Light Fixtures, Washing Machine And Exhaust Fan For A Detached Accessory Dwelling Unit
  • 2024
    permit on filePlumbing: 4 Showers, 4 Lavatories And 4 Water Closets
  • 2024
    permit on fileHeating & cooling: 4 Ventilation Fans
  • 2024
    permit on fileElectrical: 4 Branch Circuits, 30 Outlets, 20 Light Fixtures And 4 Exhaust Fans
  • 2024
    permit on fileRoom addition: Convert Existing Bedroom #3 Into Dining Area, Convert Existing Garage Into Family Room, Existing Bbq Room Into Bedroom #3 Add New Bedroom #4 Add 4 New Bathrooms. After The Addition Will Be (4 Bedrooms 6 Bathrooms)
  • 2009
    permit on filePlumbing: Plumbing For 2Nd: Unit
  • 2009
    permit on fileHeating & cooling: Install Air Conditioning And Heating System For 2N:Unit
  • 2009
    permit on fileElectrical: Electrical For 2Nd: Unit
  • 2009
    permit on fileRoom addition: Build Gazebo 256 S.F.
  • 2009
    permit on fileRoom addition: Convert Portion Of (E) Garage Into 2Nd: Unit 176 S.F. Build New 462 S.F. Living For 2Nd:Unit 1Br/1Ba & Covered Pati0291 S.F.
  • 1997
    permit on fileGeneral remodel: T/O Apply 1/2" Cdx, Gaf 20 Yr. Comp Shingle

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2024
  • 2029
    Roof replacementExpected 2029 to 2039