LAHomework Sign in
Santa Monica, CA 90405 · Ocean Park Blvd

528 Ocean Park Blvd

Built 2004 · 2,948 sq ft
LOT 4,052 SQ FT · 1 STRUCTURE · APN 4287-013-021Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2004
Living area
2,948 sqft
Lot size
4,052 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
4287-013-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2024 to 2034From build year 2004
20262035
HVACWorth a look now
Usually done by 2024From build year 2004
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 305 homes on Ocean Park Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedSolar: Installation Of 4.6Kw Photovoltaic System. Installation Of 1 Tesla System(S).
  • 2025
    permit on fileRoom addition: New 604 S/F Addition And 402 S/F Remodel To Existing Two-Story Single Family Residence.
  • 2025
    permit on file, unconfirmedSolar: Installation Of 4.6Kw Photovoltaic System. Installation Of 1 Tesla System(S).
  • 2023
    permit on fileElectrical: Installation Of One (1) New Tesla Wall Connector Inside Garage.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2024
  • Now
    Roof replacementExpected 2024 to 2034