LAHomework Sign in
Pasadena, CA 91106 · Allendale Rd

525 Allendale Rd

Built 1920 · 4,067 sq ft
LOT 15,931 SQ FT · 6 STRUCTURES · APN 5324-002-018Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1920
Living area
4,067 sqft
Lot size
15,931 sqft
Structures on lot
6 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
5
Home type
Single-family
Parcel (APN)
5324-002-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 1992
Usually done by 2022From the 1992 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 32 homes on Allendale Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedPlumbing: Express Permit. Replace Hot Water Lines For Sink, Shower And Laundry With Pex ( 3 Total Fixtures)
  • 2019
    permit on fileSolar: Install Roof Mounted Solar: 41 Pv Modules & 1 Inverter. (12.32 Kw Dc, 11.2 Kw Ac), Derating Main Breaker To 175 A (From 200 A)
  • 2011
    permit on fileElectrical: Electrical For Residential Room Addn
  • 2011
    permit on filePlumbing: Plumbing For Residential Room Addn
  • 1997
    permit on filePlumbing: Copper Water Piping Enter Residence From Main
  • 1992
    permit on fileRoof: Rf - Re-Roof Residence W/Dibiten Icbo 4392 Class A Roofing
  • 1991
    permit on filePlumbing: P2 - Kitchen/Bathrm. Remodel Plumbing Permit
  • 1991
    permit on filePlumbing: Pl - Kitchen/Bathrm. Remodel Plumbing Permit
  • 1991
    permit on fileElectrical: El - Wiring For Window A/C New Outlet
  • 1990
    permit on fileRoof: Bu - Reinforce Exist. Roof Support Of Exist. Air Conditioning Unit

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2022