LAHomework Sign in
Inglewood, CA 90304 · W 119th Pl

5249 W 119th Pl

Built 1941 · 1,421 sq ft
LOT 6,988 SQ FT · 2 STRUCTURES · APN 4140-010-034Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
1,421 sqft
Lot size
6,988 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
1
Home type
Single-family
Parcel (APN)
4140-010-034

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 72 homes on W 119th Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePlumbing: 1197 Sf Proposed 2-Story Accessory Dwelling Unit (Adu) To Contain 3 Bedrooms And 3 Baths. Pv Systems Required.
  • 2025
    permit on filePlumbing: 1197 Sf Proposed 2-Story Accessory Dwelling Unit (Adu) To Contain 3 Bedrooms And 3 Baths. Pv Systems Required.
  • 2025
    permit on fileSolar: 1197 Sf Proposed 2-Story Accessory Dwelling Unit (Adu) To Contain 3 Bedrooms And 3 Baths. Pv Systems Required.
  • 2025
    permit on fileHeating & cooling: 1197 Sf Proposed 2-Story Accessory Dwelling Unit (Adu) To Contain 3 Bedrooms And 3 Baths. Pv Systems Required.
  • 2025
    permit on fileElectrical: Permit For A Temporary Power Pole As Requested By The So Ca Edison Planner
  • 2025
    permit on fileSolar: 4.050 Kw Dc 9 Modules.
  • 2020
    permit on file, unconfirmedSolar: Roof-Mounted Solar Installation On Secondary Structure, 30 Modules With 30 Microinverters 9.9 Kw Dc Size, Main Breaker Downsized To 175 Amp See Solr191230001613 For Solar On Main Residence.
  • 2020
    permit on file, unconfirmedSolar: Roof-Mounted Solar Installation On Main Structure, 4 Modules With 4 Microinverters 1.32 Kw Dc Size, Main Breaker Downsized To 175 Amp See Solr191203001368 For Solar On Secondary Structure.
  • 2019
    permit on file, unconfirmedRoof: Re-Roof Garage With Torch Down

Manage this home to schedule a service or to update the timeline.