LAHomework Sign in
Temple City, CA 91780 · Ardenel Ave

5218 Ardenel Ave

Built 1942 · 1,474 sq ft
LOT 9,152 SQ FT · 2 STRUCTURES · APN 8589-009-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1942
Living area
1,474 sqft
Lot size
9,152 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
8589-009-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 14 homes on Ardenel Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoom addition: Convert Existing 325 Sq.Ft. Detached Garage For Existing Adu: Kitchen & Dining Room
  • 2023
    permit on fileHeating & cooling: Installation For Hvac System For Accessory Dwelling Unit
  • 2023
    permit on fileHeating & cooling: Installation For Hvac System For House Addition And Remodel
  • 2022
    permit on filePlumbing: Repair Existing Sewer Line
  • 2022
    permit on fileElectrical: Electrical Wiring, Install 200 Amp Service Panel And Ev Charger For Accessory Dwelling Unit
  • 2022
    permit on fileElectrical: New Electrical Wiring For Addition & Existing House. Install 200 Amp Service Panel, 100 Amp Sub-Panel And Ev Charger
  • 2022
    permit on fileWater heater: Bathtubs/Showers, Clothes Washer, Dishwasher, Hose Bibbs, Lavatories, Sink, Water Closets, Water Heater, Gas Outlets, Water Main And Connect Accessory Dwelling Unit To Public Sewer
  • 2022
    permit on fileWater heater: Bathtubs/Showers, Closewashers, Dishwasher, Hose Bibbs, Lavatories, Sink, Water Closet, Water Heater, Gas Outlets And Water Main For The Remodel And Addition
  • 2022
    permit on fileElectrical: Temporary Power Pole
  • 2022
    permit on fileRoom addition: 608 Sq.Ft. Interior Remodel To Relocated Family Room, Kitchen, Powder Room And 609 Sq.Ft. Addition Of One Bedroom, 2.5 Bathrooms And Front Porch 17 Sq.Ft.

Manage this home to schedule a service or to update the timeline.