LAHomework Sign in
Los Angeles, CA 90042 · Irvington Pl

5210 Irvington Pl

Built 2014 · 2,083 sq ft
LOT 6,080 SQ FT · 1 STRUCTURE · APN 5469-002-004Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2014
Living area
2,083 sqft
Lot size
6,080 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5469-002-004

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACComing up
Expected 2029 to 2034From build year 2014
20262035
Water heaterWorth a look now
Expected 2024 to 2029From build year 2014
20262035
See 1 more system expected later
RoofLater
Expected 2034 to 2044Original, built 2014
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 92 homes on Irvington Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.
  • 2022
    permit on fileSolar: Pv1. Install Solar Pv & Bess System On Single Family Home. System Comprised Of (25) 370W Pv Modules With Microinverters, Racking System, (1) 60A Ac Disconnect, (1) 125A Solar Subpanel, (1) 10.5 Kwh Energy Storage Module, (1) Microgrid Interconnection Device, (1) 125A Backup Loads Subpanel. System Si

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2024 to 2029
  • 2029
    HVAC replacementExpected 2029 to 2034