LAHomework Sign in
Los Angeles, CA 90402

521 Entrada Drive

Built 1948 · 2,753 sq ft
LOT 14,252 SQ FT · 3 STRUCTURES · APN 4410-027-032Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
2,753 sqft
Lot size
14,252 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
4410-027-032

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileHeating & cooling: Change Out Of Furnace In Same Location(Attic).
  • 2021
    permit on fileElectrical: Add 19 Recessed Led Lights, Relocate 10 Receptaxcles, Replace Hvac Circuit,
  • 2021
    permit on file, unconfirmedWater heater: Rough Plumbing For Two Bath Sinksone Toiletelectric Water Heater
  • 2021
    permit on fileHeating & cooling: Installation Of A Two Zone Mini-Split System
  • 2020
    permit on fileKitchen: Kitchen/Bathroom (2) Remodel For Residential Buildings (No Structural Changes) Combined With Mep.
  • 2020
    permit on fileGeneral remodel: Patch And Repair Plaster & Stucco On Exterior Of Historic Landmark Portion Of The Building, Paint And Finish To Match Existing Condition, Replace Exterior Windows. Renovation Of Entire Interior Space, Repaint, Installation Of New Millwork, Low Voltage Redesign, Demo Portion Of Interio Slab For Re-Po
  • 2019
    permit on file, unconfirmedGeneral remodel: Interior & Exterior Alteration To (E) Sfd. · PCH CONSTRUCTION

Manage this home to schedule a service or to update the timeline.