LAHomework Sign in
Pasadena, CA 91103 · Rosewood Ln

520 Rosewood Ln

Built 1950 · 1,467 sq ft
LOT 12,269 SQ FT · 3 STRUCTURES · APN 5711-011-029Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
1,467 sqft
Lot size
12,269 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5711-011-029

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 8 homes on Rosewood Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedRoom addition: Online: Convert Existing Detached Garage Into Adu At 405 Sq/Ft And Add On At 395 Sq/Ft; Total Accessory Dwelling Unit At 800 Sq/Ft
  • 2025
    permit on file, unconfirmedElectrical: Electrical Permit For Online: Convert Existing Detached Garage Into Adu At 405 Sq/Ft And Add On At 395 Sq/Ft; Total Accessory Dwelling Unit At 800 Sq/Ft
  • 2025
    permit on filePlumbing: Plumbing Permit For Online: Convert Existing Detached Garage Into Adu At 405 Sq/Ft And Add On At 395 Sq/Ft; Total Accessory Dwelling Unit At 800 Sq/Ft
  • 2025
    permit on fileHeating & cooling: Mechanical Permit For Online: Convert Existing Detached Garage Into Adu At 405 Sq/Ft And Add On At 395 Sq/Ft; Total Accessory Dwelling Unit At 800 Sq/Ft
  • 2014
    permit on filePlumbing: Install Plumbing Services For Remodel
  • 2014
    permit on fileHeating & cooling: Install New Hvac System
  • 2014
    permit on fileElectrical: Install Electrical Services For Remodel
  • 2014
    permit on fileKitchen: Addition Of Master Bedroom (189 S/F). Convert Porch To New Foyer (34 S/F). Interior Remodel (419 S/F) - Kitchen, Bath, Convert Master Bedroom To New Master Bath, Convert Laundry/Powder Into New Dining, And Create New Laundry Closet Near Kitchen. New Front Porch (28 S/F) & Rear Deck/Steps (25 S/F).
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram

Manage this home to schedule a service or to update the timeline.